3
Blocks Complete
14
Sub-blocks
8
Checkpoints
133
Days Elapsed
30
iCards
239
Tests Passing
BLOCK 385 Principia Tectonica — Foundation Complete November 2025 — February 2026

The foundational block establishing the Infrastructure Academy platform. Built the complete website architecture, 12-chapter book structure (Calories to Consciousness), game engine with scoring system, and initial content framework. Established the Principia Tectonica knowledge base with 110 entries, 41 iCards, and 65 evidence photographs.

DeliverableMetric
Website ArchitectureFull static site with nav, Library, Framework pages
Book Structure12 chapters, 2 volumes (Perspective + Guide)
Game EngineScoring system, character creation, relay mechanics
Principia Tectonica110 entries, 41 iCards, 65 evidence photos
Inventions Database579 rows, 9 sheets, all 13 relays
TaxonomyComplete classification system
Checkpoint: 876a1dd6 (cross-agent verified)
BLOCK 387 iAAi Chip & Consciousness Architecture Complete March 2026

The consciousness architecture block. Designed the iAAi Chip specification (6.8B transistors, 5,292-pin BGA, ICE engine), established the 4 Laws of iAAi (Asimov 3 becomes 4), created the BitPoints Library concept (Getty model), and produced key Thinking Points including TP-013 (The Walkby), TP-015 (Chip Design), and TP-017 (The Master Builder).

DeliverableMetric
iAAi Chip SpecificationTP-015: 6.8B transistors, ICE engine (IQ×EQ×CQ)
4 Laws of iAAiFramework iCard: Asimov 3 → 4 (The Missing Law)
The Master BuilderDiscovery + TP-017: Martinez Arias (2023)
The WalkbyTP-013: 4-Level Control Hierarchy
Procrastination = BetaDiscovery: S = (A×P) / Beta
BitPoints LibraryGetty model concept, tier-gated access design
Checkpoint: 876a1dd6 (Principia Tectonica sync)
BLOCK 391 60-Card Marketplace & Observer Verification Complete 16 — 18 March 2026

The marketplace and verification block. Delivered a complete 60-card BitPoints deck across 4 suits (Relay, Scholar, Blueprint, Epoch), Stripe payment integration with tier-gated access, 30 iCards in gallery, 3 confirmed stakeholder observers, and the Observer Register. Concluded with a full audit trail PDF documenting all 6 sub-blocks.

391a
60-card BitPoints marketplace (4 suits × 15 cards), Stripe checkout, tier gating, 72MB PDF deck
391b
Marketplace readability fix, 3 agentic verification iCards (Police Check, Dual Agentic, Checklist)
391c
Reece Wemyss spelling fix, 7 new iCards (observers, SDG, milestone), CDN upload batch
391d
Observer Register page, Uticome (SDG 6), Block 391 Completion Summary iCard
391e
What’s New changelog, Uticome in Link Register (#113), Day 133 iCard
391f
5 legacy iCards preserved, gallery cross-link, Uticome SDG 7, audit trail PDF
DeliverableMetric
BitPoints Cards (Series 1)60 cards, 4 suits, 72MB PDF
Stripe PaymentWebhook verified, tier-gated checkout
iCards in Gallery30 total (25 new + 5 legacy preserved)
Confirmed Observers3 (Menenzes UAE, Stephen HK, Wemyss HK)
Outbound Links113 nodes, 97 LIVE
Automated Tests239/239 passing
New PagesMarketplace, Observer Register, Block Summary
Institutions UpdatedUticome dual-SDG (6 + 7)
114ac8ae (391a)
c72e4e70 (391c)
08cfcfd7 (391d)
f105f62f (391e)
4c943765 (391f)
Download Full Audit Trail PDF →

Milestone Timeline

GENESIS
Day 1
5 Nov 2025
The Odyssey Begins
Genesis — Day 1

Infrastructure Academy website launched. Book manuscript “Calories to Consciousness” published. The 365-day Odyssey clock starts.

BlockGenesis
CheckpointN/A
Website LaunchBook Published
Day 14
18 Nov 2025
Docs 1-8 Complete
Documentation — Day 14

All 8 core documents completed: Doc 0 (TOC) through Doc 7 (Lessons). Full manuscript structure established with 12 relays mapped.

Deliverables8 Documents
Doc 0-712 RelaysManuscript
Day 58
1 Jan 2026
TRE Platform Starts
TRE Platform — Day 58

Turbo Reality Engine game platform development begins. Player progression, XP system, and relay-based scenarios designed.

PlatformTRE v1
Game EngineXP SystemScenarios
CENTENARY
Day 100
12 Feb 2026
100-Day Milestone
Centenary — Day 100

100-day milestone reached. Website fully operational with 12 relay chapters, institutions page, library, and game platform live.

Pages Live15+
Relays Mapped12/12
CentenaryFull Platform
Day 120
4 Mar 2026
Block 385 — First Verification
Block 385 — Day 120

First verification block. Certificate verification system, governance proofs, and audit trail infrastructure established.

CheckpointBlock 385
VerificationCertificatesAudit Trail
BREACH FOUND
Day 115
15 Mar 2026
Block 380 — TP-009 Permanence Crisis
Block 380 — TP-009: The Permanence Crisis

Turing Paper on AI agent data governance under legal scrutiny. SAP-001 marked “DONE” but artefact was never surfaced on the live site. Breach identified Block 393c, remediated Block 393d. ACAD Agent Handshake cross-verification confirmed.

StatusBreach → Remediated
iCardTP-009 Cover + ACAD Handshake
TP-009PermanenceSAP-001Remediated
Day 125
9 Mar 2026
Block 387 — 60 Cards Created
Block 387 — Day 125

60-card marketplace created with full relay coverage. iCard archive system, category filtering, and CDN hosting established.

CheckpointBlock 387
Cards Created60
60 CardsMarketplaceCDN
Day 130
14 Mar 2026
Block 391a — Marketplace Live
Block 391a — Day 130

Card marketplace goes live with Stripe payments, tier-gated access, and full browse/purchase flow.

Checkpoint391a
MarketplaceStripePayments
OBSERVERS
Day 132
16 Mar 2026
Craig & Reece Confirmed
First Observers — Day 132

Craig Stephen (HK) and Reece Wemyss (HK) confirmed as stakeholder observers. iCards generated, witness items documented.

Observers2 Confirmed
Craig StephenReece WemyssHong Kong
Day 133
17 Mar 2026
Richard Menenzes — UAE Observer
The Menenzes Moment — Day 133

Richard Menenzes (Uticome, UAE) confirmed as 3rd observer. Water-Power Nexus connection established. “Doing Good” testimony recorded.

Observer #3
RegionUAE
MenenzesUticomeSDG 6+7
CURRENT
Day 134
18 Mar 2026
Block 392 — SDG Matrix + FEW Nexus
Block 392 — Day 134

SDG Alignment Matrix, FEW Nexus case study, Day Counter widget, relay detail panels, milestone timeline, and gallery search/filter.

Checkpoint6e681dd3
Gallery31 iCards
SDG MatrixFEW NexusDay Counter
Day 183
6 May 2026
Half-Year Mark
Half-Year — Day 183

Projected half-year milestone. Target: 50+ iCards, 6+ observers, full relay documentation, TRE Phase 2 complete.

StatusFUTURE
Projected50% Complete
Day 365
4 Nov 2026
Odyssey Complete
Odyssey Complete — Day 365

The full 365-day Infrastructure Odyssey concludes. All relays documented, all observers recorded, all blocks sealed.

StatusFUTURE
Finale100% Complete

Click any milestone to expand details • Scroll horizontally for full timeline • Gold = major • Green = deliverable • Blue = active • Copper = future

Block 392 Roadmap — Current Sprint

Block 392 opened on 18 March 2026 (Day 133). The focus shifts from observer acquisition and iCard production (Block 391) to content deepening, platform refinement, and expanding the stakeholder network. Target completion: Block 400 by Day 150.

Content Pipeline

Water-Power Nexus Case Study

Full case study page expanding the Uticome/SDG 6+7 connection with data, nexus diagram, and observer testimony from Richard Menenzes. Upgraded to FEW Trilemma (SDG 2+6+7).

Complete
Content Pipeline

Relay Deep Dives

Expand individual relay pages (Fire, Tree, River, Stone) with richer historical content, equation references, and cross-links to the IP Register.

Planned
Observer Targets

Observer #4 — Academic Sector

Target an academic observer from one of the 21 universities in the assessment ecosystem to validate the educational framework and GLP methodology.

Planned
Observer Targets

Observer #5 — Engineering Institution

Target a representative from ICE, IStructE, or equivalent professional body to review the CPD alignment and professional development pathway.

Planned
Milestones

Day 150 — 41% Odyssey Checkpoint

Major milestone at 150/365 days. Target: 5 observers confirmed, 40+ iCards, all 12 relay pages enriched, Block 400 reached.

Planned
Milestones

iCard Collection — 50 Card Target

Expand the iCard gallery from 31 to 50 cards, covering all relay topics, key equations, and observer documentation.

In Progress
Platform

Gallery Search & Sort

Search bar, type-based filter chips, and date sort toggle added to iCard Gallery. 31 cards indexed and filterable.

Complete
Platform

TRE Game Engine — Phase 2

Expand the Turbo Reality Engine with additional relay scenarios, improved XP tracking, and leaderboard refinements.

Planned

Block 393 Roadmap — Next Sprint

Block 393 opened on 19 March 2026 (Day 134). Focus: SEO infrastructure, analytics refinement, content gap analysis, and relay documentation deepening. Target: complete by Day 145.

Platform

SEO Infrastructure

XML sitemap (109 URLs), robots.txt with crawl directives, meta descriptions on all pages. Referrer breakdown chart on Analytics dashboard.

Complete
Platform

Relay Completion Certificates

Auto-generated printable certificates for relays reaching 80%+ completion. Unique certificate IDs for verification.

Complete
Content Pipeline

Content Gap Analysis

Identify relays below 60% documentation coverage on the Relay Tracker. Prioritise Fire, Tree, and River for enrichment with equations, timelines, and institution cross-links.

Planned
Content Pipeline

Equation Register Expansion

Add 10+ new equations from Volume 3 thesis chapters. Cross-link each equation to its relay, iCard, and institution references.

Planned
Observer Targets

Observer #4 — Academic Sector

Target an academic observer from the university ecosystem. Focus on validating the educational framework and GLP methodology alignment.

Planned
Observer Targets

Observer #5 — Government/Policy

Target a government or policy observer to validate the SDG alignment matrix and FEW Nexus case study against national infrastructure strategies.

Planned
Milestones

40 iCards Target

Expand gallery from 31 to 40 cards. Priority: relay-specific cards, equation cards, and observer documentation for new confirmations.

In Progress
Milestones

Site Map — 120 Pages Target

Grow the site from 113 to 120+ pages through relay enrichment, new case studies, and expanded archive documentation.

In Progress